The requirements for the installation of
LED high bay lights are as follows:
1. Before installation, check whether the LED high bay light is complete or not and the accessories are complete.
2. When installing the LED high bay light or replacing the accessories, pay attention to disconnect the power supply first. When connecting the power supply, pay attention to the adaptation of the input voltage and the high bay light. After the power cord is connected, it is necessary to do the corresponding waterproof and insulation treatment.
3. The connection on the LED industrial and mining lamps should pass through the drill hole and the connection behind the lamp can be fixed with wire clips to ensure firmness.
4. Note that the power cord of the lamp needs to be of sufficient length and cannot be affected by tension or tangential force. When installing the connection of lamps, avoid excessive tension, and do not knot the connection. Pay attention to distinguish the output connection, and do not confuse it with other lamps.